Violation Detail
Standard Cited: 19100119 J05 Process safety management of highly hazardous chemicals.
This violation item has been deleted.
Inspection Nr: 311611081
Citation: 02017B
Citation Type: Willful
Abatement Date: 04/19/2010
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 03/08/2010
Nr Instances: 1
Nr Exposed: 25
Related Event Code (REC):
Gravity: 10
Report ID: 0524700
Contest Date: 03/31/2010
Final Order: 09/27/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | R: Review Commission | 09/27/2018 | $0.00 | Willful | ||
Penalty | Z: Issued | 03/08/2010 | $0.00 | Willful |
Text For Citation: 02 Item/Group: 017B Hazard: REFINERY
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment t hat are outside acceptable limits (as defined by process information in 29 CFR 1 910.119(d) before further use or in a safe and timely manner: a.BP-Husky Refining, LLC - Oregon, Ohio: The employer does not ensure PSV-1281, a conventional relief valve, had a back pressure of less than or equal to 10% of its set pressure. This relief device provides inadequate protection to the FCC Feed Drum, and relieves hydrocarbons to the flare. Pursuant to 29 CFR 1903.19, w ithin ten (10) calendar days of the abatement date, the employer must submit doc umentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer shall submit an abatement plan describing the actions it is taking to ensure that it is in compliance with the standards including documentation th at each pressure relief valve and associated piping for all process units have b een evaluated and, if necessary, repaired or replaced to ensure backpressure is limited in accordance with recognized and generally accepted good engineering pr actices, such as API Recommended Practice 520/521 and the ASME Boiler and Pressu re Vessel Code. The abatement plan shall establish dates during the next three months when the evaluations, repairs, and replacements shall be completed. Once the plan has been fully implemented, the employer must submit certificatio n of its full compliance with the standard.