Violation Detail
Standard Cited: 19100119 J05 Process safety management of highly hazardous chemicals.
This violation item has been deleted.
Inspection Nr: 311611081
Citation: 02015B
Citation Type: Willful
Abatement Date: 04/19/2010
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 03/08/2010
Nr Instances: 1
Nr Exposed: 25
Related Event Code (REC):
Gravity: 10
Report ID: 0524700
Contest Date: 03/31/2010
Final Order: 09/27/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | R: Review Commission | 09/27/2018 | $0.00 | Willful | ||
Penalty | Z: Issued | 03/08/2010 | $0.00 | Willful |
Text For Citation: 02 Item/Group: 015B Hazard: REFINERY
29 CFR 1910.119(j)(5): The employer does not correct deficiencies in equipment t hat are outside acceptable limits (as defined by process information in 29 CFR 1 910.119(d) before further use or in a safe and timely manner: a.BP-Husky Refining, LLC - Oregon, Ohio: The employer does not ensure PSV-136, l ocated in the Alky Unit, is properly designed. PSV-136 provides protection to th e Second Stage Butane Treater Drum by relieving hydrocarbons to the flare and wa s determined to be undersized and does not have an adequate relieving rate durin g relief scenarios. Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated t he hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an aba tement plan describing the actions it is taking to ensure that it is in complian ce with the standards for all pressure vessels in the refinery, including docume ntation that each pressure vessel is evaluated and protected by pressure-relievi ng device(s) that is appropriate for the vessel in accordance with recognized an d generally accepted good engineering practices, such as the ASME Boiler and Pre ssure Vessel Code. The abatement plan shall establish dates during the next three months when the e valuations and installation of adequate overpressure protection shall be complet ed. Once the plan has been fully implemented, the employer must submit certifica tion of its full compliance with the standard.