Violation Detail
Standard Cited: 19100119 D03 II Process safety management of highly hazardous chemicals.
This violation item has been deleted.
Inspection Nr: 311611081
Citation: 02015A
Citation Type: Willful
Abatement Date: 04/19/2010
Initial Penalty: $70,000.00
Current Penalty: $0.00
Issuance Date: 03/08/2010
Nr Instances: 1
Nr Exposed: 25
Related Event Code (REC):
Gravity: 10
Report ID: 0524700
Contest Date: 03/31/2010
Final Order: 09/27/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | R: Review Commission | 09/27/2018 | $0.00 | Willful | ||
Penalty | Z: Issued | 03/08/2010 | $70,000.00 | Willful |
Text For Citation: 02 Item/Group: 015A Hazard: REFINERY
29 CFR 1910.119(d)(3)(ii): The employer does not document that the equipment in the process complies with recognized and generally accepted good engineering pra ctices: a.BP-Husky Refining, LLC - Oregon, Ohio: The employer does not document compliance with recognized and generally accepted good engineering practices by ensuring PSV-136, located in the Alky Unit, is properly designed. PSV-136 provid es protection to the Second Stage Butane Treater Drum by relieving hydrocarbons to the flare and was determined be undersized and does not have an adequate reli eving rate during relief scenarios. Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation that it has abated the hazard. In addition, under 29 CFR 1903.19(e), the employer must submit an abatement plan describing the act ions it is taking to ensure that it is in compliance with the standards for all pressure vessels in the refinery, including documentation that each pressure ves sel is evaluated and protected by pressure-relieving device(s) that is appropria te for the vessel in accordance with recognized and generally accepted good engi neering practices, such as the ASME Boiler and Pressure Vessel Code. The abateme nt plan shall establish dates during the next three months when the evaluations and installation of adequate overpressure protection shall be completed. Once th e plan has been fully implemented, the employer must submit certification of its full compliance with the standard.