Violation Detail
Standard Cited: 19100106 C04 Flammable liquids.
Inspection Nr: 310149836
Citation: 01005
Citation Type: Serious
Abatement Date: 06/13/2008 X
Initial Penalty: $5,000.00
Current Penalty: $4,000.00
Issuance Date: 04/30/2008
Nr Instances: 4
Nr Exposed: 4
Related Event Code (REC):
Gravity: 10
Report ID: 0213400
Contest Date: 05/21/2008
Final Order: 09/29/2008
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | R: Review Commission | 09/29/2008 | $4,000.00 | 06/13/2008 | Serious | |
Penalty | J: ALJ Decision | 05/21/2008 | $4,000.00 | 06/13/2008 | Serious | |
Penalty | Z: Issued | 04/30/2008 | $5,000.00 | 06/13/2008 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard: REFINERY
29 CFR 1910.106(c)(4): Piping systems were not substantially supported and protected against physical damage and excessive stresses arising from settlement, vibration, expansion, or contraction: a) 2PF - The steel support under the 14 in. elbow for the PF85 control valve had corroded leaving the elbow unsupported. Condition noted on or about 01/16/08. b) 2PF - Inlet piping on the E101F was inadequately supported in that the welds on the spring can supporting the 8 in. piping were broken. Condition noted on or about 01/16/08. c) ABW - Two vertical steel beams had corroded near their concrete pads north of DR1. Condition noted on or about 02/28/08. d) ABW - The horizontal steel beam above P7 was substantially corroded with a large rusted out section in the middle of the beam. Condition noted on or about 02/28/08.