Violation Detail
Standard Cited: 19100169 A02 I Air receivers.
Inspection Nr: 1525407.015
Citation: 01003A
Citation Type: Serious
Abatement Date: 03/31/2022 2
Initial Penalty: $4,973.00
Current Penalty: $2,250.00
Issuance Date: 08/11/2021
Nr Instances: 1
Nr Exposed: 8
Related Event Code (REC):
Gravity: 1
Report ID: 0112000
Contest Date:
Final Order: 09/24/2021
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | P: Petition to Mod Abatement | 09/28/2021 | $2,250.00 | 03/31/2022 | Serious | |
Penalty | I: Informal Settlement | 09/24/2021 | $2,250.00 | 09/28/2021 | Serious | |
Penalty | Z: Issued | 08/11/2021 | $4,973.00 | 09/28/2021 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1910.169(a)(2)(i): Air receivers were not constructed in accordance with the 1968 edition of the A.S.M.E. Boiler and Pressure Vessel Code, Section VIII, which is incorporated by reference as specified in 1910.6: Machine Shop: On, or about, May 6, 2021, an air receiver tank provided on Machine 106005, a Hurco VM1 milling center, was not provided with a tag or plate to indicate that it had been constructed in accordance with ASME standards.