Violation Detail
Standard Cited: 19260403 B02 General requirements.
Inspection Nr: 1510015.015
Citation: 01001
Citation Type: Serious
Abatement Date: 02/25/2021 2
Initial Penalty: $1,755.00
Current Penalty: $500.00
Issuance Date: 02/12/2021
Nr Instances: 2
Nr Exposed: 3
Related Event Code (REC):
Gravity: 1
Report ID: 0625400
Contest Date:
Final Order: 04/02/2021
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/02/2021 | $500.00 | 02/25/2021 | Serious | |
Penalty | Z: Issued | 02/12/2021 | $1,755.00 | 02/25/2021 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.403(b)(2):Listed, labeled, or certified equipment was not installed and used in accordance with instructions included in the listing, labeling, or certification: On or about January 11, 2021, and at times prior thereto, three extension cords were inter-connected in order to achieve the length needed to supply power to a Seamer Machine, Makita Model DS4000, Serial Number 13958, exposing the employees to an electrical shock hazard.