Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1506013.015
Citation: 01002
Citation Type: Other
Abatement Date: 06/28/2021 2
Initial Penalty: $13,653.00
Current Penalty: $6,828.00
Issuance Date: 03/31/2021
Nr Instances: 1
Nr Exposed: 12
Related Event Code (REC):
Gravity: 10
Report ID: 0522000
Contest Date:
Final Order: 04/28/2021
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/28/2021 | $6,828.00 | 06/28/2021 | Other | |
Penalty | Z: Issued | 03/31/2021 | $13,653.00 | 05/05/2021 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(6)(i): The employer shall conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed. (c)(6)(i)(A) The periodic inspection shall be performed by an authorized employee other than the ones(s) utilizing the energy control procedure being inspected. (c)(6)(i)(B) The periodic inspection shall be conducted to correct any deviations or inadequacies identified. (c)(6)(i)(C) Where lockout is used for energy control, the periodic inspection shall include a review, between the inspector and each authorized employee, of that employee's responsibilities under the energy control procedure being inspected. a) On or about December 10, 2020, the employer had not performed a periodic inspection for the Rittal 2009 Riweld Seam Welder machine number 21041405.