Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1488744.015
Citation: 01001A
Citation Type: Serious
Abatement Date: 11/22/2022 2
Initial Penalty: $13,516.00
Current Penalty: $13,516.00
Issuance Date: 02/08/2021
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity: 10
Report ID: 0418300
Contest Date: 03/08/2021
Final Order: 08/22/2022
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 08/22/2022 | $13,516.00 | 11/22/2022 | Serious | |
Penalty | C: Contested | 03/12/2021 | $13,516.00 | 03/05/2021 | Serious | |
Penalty | Z: Issued | 02/08/2021 | $13,516.00 | 03/05/2021 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: (a) On or about 08/12/2020 - Resin Department, authorized employees were exposed to hazardous chemical energy when the employer did not ensure that a procedure was utilized to control the potentially hazardous chemical energy before the employees started conducting a line break to remove a dosing nozzle from a line that contained a monomer consisting of approximately 85% Terephthalic Acid and 15% Ethylene Glycol, Polyester Grade and at a temperature of approximately 265 to 275 degrees C (509 to 527 degrees F). The employer did not ensure that the employees followed all of the steps in the written Work Instruction "Shut Down" reference #PU-WI-RES-SD-030 for shutting down the process between reactors UPR-1 and UPR-2 such as, but not limited to, affixing lockout devices, tagout devices, or other control measures to the valves before the employees conducted the line break. The employer did not ensure that the employees followed all of the steps in the Standard Operating Procedure "Lockout/Tagout Protocal" reference #PU-SOP-ESSH-LOTOP-002 for additional application of the control steps, such as, but not limited to, utilizing a Hazardous Work Permit and performing an energy isolation verification check.