Violation Detail
Standard Cited: 19100269 D08 II Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1486468.015
Citation: 01004B
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 10/09/2020
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): A;R
Gravity: 10
Report ID: 0522500
Contest Date:
Final Order: 11/05/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/05/2020 | $0.00 | Serious | ||
Penalty | Z: Issued | 10/09/2020 | $0.00 | Serious |
Text For Citation: 01 Item/Group: 004B Hazard:
29 CFR 1910.269(d)(8)(ii): When servicing or maintenance is performed by a crew, craft, department, or other group, they shall use a procedure which affords the employees a level of protection equivalent to that provided by the implementation of a personal lockout or tagout device. Group lockout or tagout devices shall be used in accordance with the procedures required by paragraphs (d)(2)(iii) and (d)(2)(iv) of this section. a. On or about August 3, 2020, employees were exposed to electrical arc flash and shock hazards during troubleshooting and repair work performed on an energized 4,000 volt Pulverizer & Pulverizer Fan No. 6 breaker. The employer did not ensure that group lockout or tagout was performed.