Violation Detail
Standard Cited: 19260850 A Preparatory operations.
Inspection Nr: 1475998.015
Citation: 01002
Citation Type: Serious
Abatement Date: 09/11/2020 2
Initial Penalty: $13,494.00
Current Penalty: $13,000.00
Issuance Date: 09/02/2020
Nr Instances: 2
Nr Exposed: 2
Related Event Code (REC): A
Gravity: 10
Report ID: 0523300
Contest Date:
Final Order: 09/28/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/28/2020 | $13,000.00 | 09/11/2020 | Serious | |
Penalty | Z: Issued | 09/02/2020 | $13,494.00 | 09/11/2020 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.850(a): The employer did not have written evidence of the engineering survey that had been performed prior to the start of demolition operations: On or about May 22, 2020 the employer did not have written documentation of the engineering survey that was completed prior to the start of demolition activities.