Violation Detail
Standard Cited: 19260753 D02 III Hoisting and rigging.
Inspection Nr: 1475116.015
Citation: 01004
Citation Type: Serious
Abatement Date: 12/30/2020 2
Initial Penalty: $9,446.00
Current Penalty: $6,250.00
Issuance Date: 11/10/2020
Nr Instances: 1
Nr Exposed: 7
Related Event Code (REC):
Gravity: 10
Report ID: 0112000
Contest Date:
Final Order: 12/09/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/09/2020 | $6,250.00 | 12/30/2020 | Serious | |
Penalty | Z: Issued | 11/10/2020 | $9,446.00 | 12/30/2020 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1926.753(d)(2)(iii): All loads shall be rigged by a qualified rigger. On or about May 12, 2020, 85 ft. long steel trusses were being hoisted over connectors and other personnel working within the structure, and the loads were not rigged by a qualified rigger.