Violation Detail
Standard Cited: 19100146 C02 Permit-required confined spaces
Inspection Nr: 1471368.015
Citation: 01001
Citation Type: Other
Abatement Date: 3
Initial Penalty: $13,494.00
Current Penalty: $13,494.00
Issuance Date: 09/18/2020
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): A
Gravity: 10
Report ID: 0625700
Contest Date:
Final Order: 10/07/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/07/2020 | $13,494.00 | Other | ||
Penalty | Z: Issued | 09/18/2020 | $13,494.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.146(c)(2): The employer did not inform exposed employees, by posting danger signs or by any other equally effective means, of the existence and location of and the danger posed by the permit spaces: a) On or about March 29, 2020, PVC Unit, line 3, reactor 8; the employer did not ensure that the entry point of a permit required confined space was adequately marked to warn exposed employees of the dangers posed if entered.