Violation Detail
Standard Cited: 19100177 D04 Servicing multi-piece and single piece rim wheels.
Inspection Nr: 1454896.015
Citation: 01003
Citation Type: Serious
Abatement Date: 04/21/2020 2
Initial Penalty: $13,494.00
Current Penalty: $13,000.00
Issuance Date: 03/27/2020
Nr Instances: 1
Nr Exposed: 6
Related Event Code (REC): A
Gravity: 10
Report ID: 0728900
Contest Date:
Final Order: 04/15/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/15/2020 | $13,000.00 | 04/21/2020 | Serious | |
Penalty | Z: Issued | 03/27/2020 | $13,494.00 | 04/21/2020 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.177(d)(4): The employer did not furnish or assure that employees use an air line assembly which includes a clip-on chuck, an inline valve with a pressure gauge or a preset able regulator, and a sufficient length of hose between the clip-on chuck: The employer is failing to protect employees from struck-by hazards associated with servicing single rim wheels. This was most recently documented on January 9, 2020 at 365 Main St, Burr, Nebraska where the employer had not ensured their employee was using an inline valve with a pressure gage or a preset able regulator when servicing single rim wheels.