Violation Detail
Standard Cited: 19100303 F02 General.
Inspection Nr: 1453501.015
Citation: 01001
Citation Type: Serious
Abatement Date: 04/17/2020 2
Initial Penalty: $13,494.00
Current Penalty: $8,096.00
Issuance Date: 04/10/2020
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): R
Gravity: 10
Report ID: 0626700
Contest Date:
Final Order: 06/01/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/01/2020 | $8,096.00 | 04/17/2020 | Serious | |
Penalty | Z: Issued | 04/10/2020 | $13,494.00 | 04/17/2020 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.303(f)(2): Each service, feeder, and branch circuit, at its disconnecting means or overcurrent device, was not legibly marked to indicate its purpose, nor located and arranged so the purpose was evident: a) At the jobsite, the 277 Volt, the L2C and L2D Breaker Panels were not marked with the correct branch circuits and equipment that each breaker controlled.