Violation Detail
Standard Cited: 19100036 D03 Design and construction requirements for exit routes.
Inspection Nr: 1441625.015
Citation: 01003
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $12,145.00
Current Penalty: $3,238.56
Issuance Date: 02/14/2020
Nr Instances: 3
Nr Exposed: 5
Related Event Code (REC):
Gravity: 10
Report ID: 0419400
Contest Date:
Final Order: 02/27/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/27/2020 | $3,238.56 | Serious | ||
Penalty | Z: Issued | 02/14/2020 | $12,145.00 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.36(d)(3): An exit route door may be locked from the inside only in mental, penal, or correctional facilities and then only if supervisory personnel are continuously on duty and the employer has a plan to remove occupants from the facility during an emergency. (a) Throughout the facility - On or about October 29, 2019 the employer directed the employees to slide the lock bolt closed while the store is open exposing employees to fire hazards.