Violation Detail
Standard Cited: 19100212 A03 II General requirements for all machines.
Inspection Nr: 1435037.015
Citation: 01002
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $13,494.00
Current Penalty: $13,494.00
Issuance Date: 02/24/2020
Nr Instances: 1
Nr Exposed: 8
Related Event Code (REC): A;R
Gravity: 10
Report ID: 0627100
Contest Date:
Final Order: 03/18/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/18/2020 | $13,494.00 | Serious | ||
Penalty | Z: Issued | 02/24/2020 | $13,494.00 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.212(a)(3)(ii): Point(s) of operation of machines were not guarded to prevent employee(s) from having any part of their body in the danger zone(s) during operating cycle(s): On or about 12 September , 2019, at the bottom rail department; the rivet squeeze machine(s) were guarded to prevent the employees from putting their hands inside the point of operation when making adjustments. This condition exposed employees to struck by and/or caught between hazards.