Violation Detail
Standard Cited: 19100212 A03 II General requirements for all machines.
Inspection Nr: 1424049.015
Citation: 01003
Citation Type: Serious
Abatement Date: 02/05/2020 2
Initial Penalty: $3,856.00
Current Penalty: $2,313.60
Issuance Date: 01/16/2020
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 5
Report ID: 0420600
Contest Date:
Final Order: 01/31/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/31/2020 | $2,313.60 | 02/05/2020 | Serious | |
Penalty | Z: Issued | 01/16/2020 | $3,856.00 | 02/05/2020 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.212(a)(3)(ii): Point(s) of operation of machinery were not guarded to prevent employee(s) from having any part of their body in the danger zone(s) during operating cycle(s): a. On or about 08/22/2019, employees were exposed to a caught-by hazard, in that, a 165 ton TruFab press brake, serial number CHPB/7-8206, was used with a foot pedal control without a point of operation guard.