Violation Detail
Standard Cited: 19100303 B01 General.
This violation item has been deleted.
Inspection Nr: 1421498.015
Citation: 01011
Citation Type: Serious
Abatement Date: 03/12/2020
Initial Penalty: $8,675.00
Current Penalty: $0.00
Issuance Date: 01/31/2020
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 5
Report ID: 0418100
Contest Date:
Final Order: 02/18/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/18/2020 | $0.00 | 03/12/2020 | Serious | |
Penalty | Z: Issued | 01/31/2020 | $8,675.00 | 03/12/2020 | Serious |
Text For Citation: 01 Item/Group: 011 Hazard:
29 CFR 1910.303(b)(1): Electrical equipment was not free from recognized hazards that were likely to cause death or serious physical harm to employees: a) Plant, aisle between Hydro-Cooler #1 and Hydro-Cooler #2 - On or about 08/06/19 and at times prior thereto, the 50 A 240 V outlet mounted on the wall was broken, exposing live terminals. Employees were exposed to electrical shock and burn hazards. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).