Violation Detail
Standard Cited: 19261203 E02 V A
Inspection Nr: 1414056.015
Citation: 01002C
Citation Type: Serious
Abatement Date: 02/03/2020 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 01/07/2020
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity: 10
Report ID: 0418400
Contest Date:
Final Order: 02/06/2020
Emphasis:
Substance: X100
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/06/2020 | $0.00 | 02/03/2020 | Serious | |
Penalty | Z: Issued | 01/07/2020 | $0.00 | 02/03/2020 | Serious |
Text For Citation: 01 Item/Group: 002C Hazard:
29 CFR 1926.1203(e)(2)(v)(A): Continuous forced air ventilation was not used when an employee entered a space and until a hazardous atmosphere had been eliminated: (a) At the construction site on Belfast Keller and Interstate I-95, on or about July 8, 2019, the employer did not ensure that forced air ventilation was used inside an underground water main vault before employees entered the space, exposing employees to an oxygen deficient atmosphere.