Violation Detail
Standard Cited: 19100305 B01 I Wiring methods, components, and equipment for general use.
Inspection Nr: 1407005.015
Citation: 02019A
Citation Type: Other
Abatement Date: 3
Initial Penalty: $5,834.00
Current Penalty: $0.00
Issuance Date: 10/31/2019
Nr Instances: 2
Nr Exposed: 5
Related Event Code (REC):
Gravity:
Report ID: 0112000
Contest Date: 11/27/2019
Final Order: 03/27/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 03/27/2020 | $0.00 | Other | ||
Penalty | F: Formal Settlement | 03/27/2020 | $0.00 | Other | ||
Penalty | C: Contested | 12/05/2019 | $5,834.00 | Serious | ||
Penalty | Z: Issued | 10/31/2019 | $5,834.00 | Serious |
Text For Citation: 02 Item/Group: 019A Hazard:
29 CFR 1910.305(b)(1)(i): Conductors entering cutout boxes, cabinets, or fittings were not protected from abrasions: A. Block Plant, Main Floor: On, or about, June 18, 2019, liquid tight conduit that connected the MGM transformer to the rear of the splitter/turnover control enclosure was pulled from the enclosure, exposing the inner conductors. B. Block Plant, Main Floor, Pattern Maker: On, or about, June 18, 2019, liquid tight conduit provided for line shaft power was pulled from the side of an electrical box.