Violation Detail
Standard Cited: 19100335 A01 II Safeguards for personnel protection.
Inspection Nr: 1406641.015
Citation: 02005
Citation Type: Other
Abatement Date: 10/15/2019 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/13/2019
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity:
Report ID: 0419400
Contest Date:
Final Order: 10/15/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 09/13/2019 | $0.00 | 10/15/2019 | Other |
Text For Citation: 02 Item/Group: 005 Hazard:
29 CFR 1910.335(a)(1)(ii): Protective equipment was not maintained in a safe, reliable condition and/or was not periodically inspected or tested: (a) Throughout the facility - On or about June 7, 2019 the employer failed to have the electrical rated gloves retested as required by the manufacturer every 6 months exposing employees to electrical shock hazards.