Violation Detail
Standard Cited: 19100305 G02 II Wiring methods, components, and equipment for general use.
Inspection Nr: 1406641.015
Citation: 02004
Citation Type: Other
Abatement Date: 10/08/2019 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/13/2019
Nr Instances: 3
Nr Exposed: 5
Related Event Code (REC):
Gravity:
Report ID: 0419400
Contest Date:
Final Order: 10/15/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 09/13/2019 | $0.00 | 10/08/2019 | Other |
Text For Citation: 02 Item/Group: 004 Hazard:
29 CFR 1910.305(g)(2)(ii): Hard-service cord and junior hard-service cord No. 14 and larger were repaired by splicing, which did not retain the insulation, outer sheath properties, and usage characteristics of the cord that was spliced:Note: Hard service flexible cords No. 12 or larger may be spliced if the splice retains the insulation, outer sheath properties, and usage characteristics of the cord being spliced. (a) SPM Machine - On or about June 7, 2019 The employer had two portable fans power cords spliced together using black tape exposing employees to electrical shock hazards.