Violation Detail
Standard Cited: 19100303 B02 General.
Inspection Nr: 1406641.015
Citation: 02001
Citation Type: Other
Abatement Date: 3
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/13/2019
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity:
Report ID: 0419400
Contest Date:
Final Order: 10/15/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 09/13/2019 | $0.00 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.303(b)(2): Electrical equipment was not used or installed in accordance with instructions included in the listing or labeling. (a) D- Coiler machine - On or about June 7, 2019 the employer used two sections of an electrical power strips plugged together for fan exposing employees to electrical shock hazards.