Violation Detail
Standard Cited: 19100124 B04 IV
Inspection Nr: 1404345.015
Citation: 01001A
Citation Type: Serious
Abatement Date: 09/28/2020 2
Initial Penalty: $11,934.00
Current Penalty: $8,000.00
Issuance Date: 10/04/2019
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC): C
Gravity: 10
Report ID: 0111100
Contest Date: 10/17/2019
Final Order: 10/01/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 10/01/2020 | $8,000.00 | 09/28/2020 | Serious | |
Penalty | C: Contested | 10/28/2019 | $11,934.00 | 04/03/2020 | Serious | |
Penalty | Z: Issued | 10/04/2019 | $11,934.00 | 04/03/2020 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.124(b)(4)(iv): Mechanical ventilation did not conform to ANSI Z9.1-1971, Practices for Ventilation and Operation of Open-Surface Tanks, and NFPA 34-1966, Standard for Dip Tanks Containing Flammable or Combustible Liquids: Black Oxide Room - The ventilation practices did not conform to ANSI Z9.1-1971, Practices for Ventilation and Operation of Open-Surface Tanks, and NFPA 34-1966, Standard for Dip Tanks Containing Flammable or Combustible Liquids, in the following instances: Section 8.1 - Air flow from each hood was not measured by means of a pitot traverse in each exhaust duct after the equipment had been shut down for at least a month, and at intervals of not more than 3 months of operation.