Violation Detail
Standard Cited: 19100305 G01 IV B Wiring methods, components, and equipment for general use.
Inspection Nr: 1397132.015
Citation: 01003
Citation Type: Serious
Abatement Date: 10/02/2019 2
Initial Penalty: $3,978.00
Current Penalty: $2,784.60
Issuance Date: 09/12/2019
Nr Instances: 1
Nr Exposed: 5
Related Event Code (REC): C
Gravity: 1
Report ID: 0522300
Contest Date:
Final Order: 09/30/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/30/2019 | $2,784.60 | 10/02/2019 | Serious | |
Penalty | Z: Issued | 09/12/2019 | $3,978.00 | 10/02/2019 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.305(g)(1)(iv)(B): Unless specifically permitted otherwise in paragraph (g)(1)(ii) of this section, flexible cords and cables may not be used where run through holes in walls, ceilings, or floors: On or about April 30, 2019 the employer failed to ensure that flexible cords supplying power to 36v battery chargers and other equipment was not ran through holes in ceilings and walls. Multiple flexible cords were ran through walls and ceilings near the pattern storage area.