Violation Detail
Standard Cited: 19260651 I03 Specific Excavation Requirements.
Inspection Nr: 1396424.015
Citation: 01001
Citation Type: Serious
Abatement Date: 11/20/2019 2
Initial Penalty: $13,260.00
Current Penalty: $13,260.00
Issuance Date: 10/24/2019
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): A
Gravity: 10
Report ID: 0418100
Contest Date:
Final Order: 11/18/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/18/2019 | $13,260.00 | 11/20/2019 | Serious | |
Penalty | Z: Issued | 10/24/2019 | $13,260.00 | 11/20/2019 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.651(i)(3): Sidewalks, pavements, or appurtenant structures had been undermined and a support system or another method was not provided to protect employees from the possible collapse of such structures. On or about April 25, 2019, at the Winmire Estates subdivision 5324 Winmire, Stone Mountain, Georgia: Employees were exposed to fall and cave-in hazards while working around pavement that had been undermined and not protected.