Violation Detail
Standard Cited: 19100303 F02 General.
Inspection Nr: 1376923.015
Citation: 02001
Citation Type: Other
Abatement Date: 08/14/2019 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/19/2019
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): A
Gravity:
Report ID: 0316700
Contest Date:
Final Order: 08/05/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/05/2019 | $0.00 | 08/14/2019 | Other | |
Penalty | Z: Issued | 07/19/2019 | $0.00 | 08/14/2019 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.303(f)(2): Each service, feeder, and branch circuit, at its disconnecting means or over current device, was not legibly marked to indicate its purpose, nor located and arranged so the purpose was evident: (a) Mezzanine - The conveyor E stop button was not labeled to indicate its purpose, on or about February 6, 2019. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.