Violation Detail
Standard Cited: 19100265 C03 III Sawmills.
Inspection Nr: 1374648.015
Citation: 03004
Citation Type: Other
Abatement Date: 08/14/2019 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/17/2019
Nr Instances: 1
Nr Exposed: 14
Related Event Code (REC):
Gravity:
Report ID: 0521100
Contest Date:
Final Order: 08/08/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/08/2019 | $0.00 | 08/14/2019 | Other | |
Penalty | Z: Issued | 07/17/2019 | $0.00 | 08/14/2019 | Serious |
Text For Citation: 03 Item/Group: 004 Hazard:
29 CFR 1910.265(c)(3)(iii): Floor maintenance. The flooring of buildings, docks, and passageways shall be kept in good repair. When a hazardous condition develops that cannot be immediately repaired, the area shall be guarded until adequate repairs are made. On or about March 19, 2019, the floor on the west side of the sawmill was not kept in good repair. Water had created two soft spots in the Sawmill floor.