Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1374288.015
Citation: 01001A
Citation Type: Serious
Abatement Date: 08/07/2019 2
Initial Penalty: $9,282.00
Current Penalty: $6,000.00
Issuance Date: 06/20/2019
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): R
Gravity: 10
Report ID: 0134000
Contest Date:
Final Order: 07/15/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/15/2019 | $6,000.00 | 08/07/2019 | Serious | |
Penalty | Z: Issued | 06/20/2019 | $9,282.00 | 08/07/2019 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section. Location: Foiling room On or about January 25, 2019, an energy control procedure specific to the sloop foiling machine was not developed, documented, or utilized by employees following the amputation injury on January 3, 2019.