Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1368738.015
Citation: 01001B
Citation Type: Serious
Abatement Date: 04/03/2019 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 03/08/2019
Nr Instances: 1
Nr Exposed: 6
Related Event Code (REC):
Gravity: 10
Report ID: 0524700
Contest Date:
Final Order: 03/27/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/27/2019 | $0.00 | 04/03/2019 | Serious | |
Penalty | Z: Issued | 03/08/2019 | $0.00 | 03/19/2019 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: a. On or about December 22, 2018, a periodic inspection of the energy control procedures was not performed to assure that the lockout/tagout procedure and requirements of 29 CFR 1910.147 were being followed. The employer did not ensure that the energy control procedure for Chop Line equipment such as, but not limited to, the baler and conveyors was inspected.