Violation Detail
Standard Cited: 19260451 B09 General requirements.
Inspection Nr: 1364827.015
Citation: 01001B
Citation Type: Serious
Abatement Date: 02/11/2019 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 01/28/2019
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): R
Gravity: 10
Report ID: 0317900
Contest Date:
Final Order: 02/13/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/13/2019 | $0.00 | 02/11/2019 | Serious | |
Penalty | Z: Issued | 01/28/2019 | $0.00 | 02/11/2019 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1926.451(b)(9): Wood platforms were covered with an opaque finish so as to obscure the top or bottom surface: a) Gymnasium Floor - On or about December 7, 2018, 2 X 10 wood planks used on the top level of a Bil-Jax brand fabricated frame, mobile scaffold, more than 10 feet above a lower level were covered with paint.