Violation Detail
Standard Cited: 19100107 B05 I Spray finishing using flammable and combustible materials.
Inspection Nr: 1364763.015
Citation: 02003
Citation Type: Other
Abatement Date: 04/29/2019 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/03/2019
Nr Instances: 2
Nr Exposed: 4
Related Event Code (REC):
Gravity:
Report ID: 0111700
Contest Date: 04/24/2019
Final Order: 04/27/2022
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 04/27/2022 | $0.00 | 04/29/2019 | Other | |
Penalty | C: Contested | 05/14/2019 | $0.00 | 04/29/2019 | Other | |
Penalty | Z: Issued | 04/03/2019 | $0.00 | 04/29/2019 | Other |
Text For Citation: 02 Item/Group: 003 Hazard:
29 CFR 1910.107(b)(5)(i): The spraying operations (except electrostatic spraying operations) were not designed, installed and maintained such that the average air velocity over the open face of the booth (or booth cross section during spraying operations) was not less than 100 linear feet per minute. Visible gauges or audible alarm or pressure activated devices were not installed to indicate or insure that the required air velocity was maintained. Location: old and new spray booths a) On or about December 6, 2018, the employer did not ensure that air velocity over the open face of the booth was greater than 100 linear feet per minute. b) On or about December 6, 2018, The employer did not install visible gauges or audible alarm or pressure activated devices to indicate or insure that the required air velocity was maintained.