Violation Detail
Standard Cited: 19100269 C01 II Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1364276.015
Citation: 01001
Citation Type: Serious
Abatement Date: 06/24/2019 2
Initial Penalty: $13,260.00
Current Penalty: $13,260.00
Issuance Date: 05/29/2019
Nr Instances: 1
Nr Exposed: 8
Related Event Code (REC): A
Gravity: 10
Report ID: 0936400
Contest Date: 06/21/2019
Final Order: 12/27/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 12/27/2019 | $13,260.00 | 06/24/2019 | Serious | |
Penalty | C: Contested | 06/25/2019 | $13,260.00 | 06/24/2019 | Serious | |
Penalty | Z: Issued | 05/29/2019 | $13,260.00 | 06/24/2019 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.269(c)(1)(ii): The employer did not ensure that the employee in charge conducted a job briefing that met paragraphs (c)(2) though (c)(4) of this section with the employees involved before they start each job: a) MCC ROOM: A job briefing including the required subjects under 29 CFR 1910.269 (c)(2) was not conducted to inform workers of the hazards associated with racking and rolling in the switchgear for the main air compressor, exposing employees to hazards from arc flashes including burns and heat inhalation. On December 5, 2018, three employee sustained burns resulting from an arc flash.