Violation Detail
Standard Cited: 19261437 C02 I
Inspection Nr: 1361975.015
Citation: 01003
Citation Type: Serious
Abatement Date: 05/28/2019 2
Initial Penalty: $9,282.00
Current Penalty: $7,425.60
Issuance Date: 05/08/2019
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): A
Gravity: 10
Report ID: 0625700
Contest Date:
Final Order: 05/23/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/23/2019 | $7,425.60 | 05/28/2019 | Serious | |
Penalty | Z: Issued | 05/08/2019 | $9,282.00 | 05/28/2019 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.1437(c)(2)(i): The employer did not erect and maintain control lines, warning lines, railings or similar barriers to mark the boundaries of the hazard areas; or Clearly mark the hazard areas by a combination of warning signs (such as, "Danger--Swing/Crush Zone") and high visibility markings on the equipment that identify the hazard areas: On or about 11/15/2018, at (29*26.481 N- 91* 10.188 W) Plum Bayou, Houma, LA, employees were operating a derrick on a barge to lift wooden pylons from the barge to the shore without maintaining warning lines or barriers of hazard areas on the barge around the derrick.