Violation Detail
Standard Cited: 19100179 J02 IV Overhead and gantry cranes.
Inspection Nr: 1354960.015
Citation: 02003
Citation Type: Other
Abatement Date: 04/02/2019 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 03/07/2019
Nr Instances: 1
Nr Exposed: 10
Related Event Code (REC):
Gravity:
Report ID: 0213900
Contest Date:
Final Order: 04/05/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/05/2019 | $0.00 | 04/02/2019 | Other | |
Penalty | Z: Issued | 03/07/2019 | $0.00 | 04/02/2019 | Other |
Text For Citation: 02 Item/Group: 003 Hazard:
29 CFR 1910.179(j)(2)(iv): Monthly inspections of hoist chains, with a certification record which includes the date of inspection, the signature of the person who performed the inspection and an identifier of the chain which was inspected, were not performed: a) Northeast Precast LLC.- Throughout the manufacturing area: The employer did not conduct a monthly inspection of the hoist chains with the required written certification on the 1 P&H 5 Ton crane, 2 P&H 5 Ton crane, DEMAG 20 Ton crane, etc. However the employer conducted a visual inspection on the cranes every three months, no written certification records were done, on or about 10/03/2018.