Violation Detail
Standard Cited: 19100305 J02 IV Wiring methods, components, and equipment for general use.
Inspection Nr: 1354122.015
Citation: 01008
Citation Type: Other
Abatement Date: 05/01/2019 2
Initial Penalty: $9,282.00
Current Penalty: $1,000.00
Issuance Date: 04/03/2019
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): R
Gravity:
Report ID: 0636900
Contest Date:
Final Order: 04/29/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/29/2019 | $1,000.00 | 05/01/2019 | Other | |
Penalty | Z: Issued | 04/03/2019 | $9,282.00 | 05/01/2019 | Serious |
Text For Citation: 01 Item/Group: 008 Hazard:
29 CFR 1910.305(j)(2)(iv): A receptacle installed in a wet or damp location was not suitable for the location. In the pit beneath the Open Flame Rotational Molding 530 EXT Machine, a 240V receptacle was installed to energize fans and not suitable for the wet location exposing employees to electrical shock hazards.