Violation Detail
Standard Cited: 19260451 G03 IV General requirements.
Inspection Nr: 1344917.015
Citation: 01002
Citation Type: Serious
Abatement Date: 12/06/2018 3
Initial Penalty: $5,691.00
Current Penalty: $2,845.50
Issuance Date: 11/28/2018
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 10
Report ID: 0420600
Contest Date:
Final Order: 01/16/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/16/2019 | $2,845.50 | 12/06/2018 | Serious | |
Penalty | Z: Issued | 11/28/2018 | $5,691.00 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.451(g)(3)(iv): Vertical lifelines, independent support lines, and suspension ropes were attached to the same point on the scaffold or personal fall arrest system: a. On or about 09/06/18, on the roof of building 4575, employees attached two lifelines to a single temper roof anchor.