Violation Detail
Standard Cited: 19100217 B12 Mechanical power presses.
Inspection Nr: 1334912.015
Citation: 01005
Citation Type: Serious
Abatement Date: 03/01/2019 2
Initial Penalty: $6,630.00
Current Penalty: $3,900.00
Issuance Date: 01/25/2019
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 5
Report ID: 0134000
Contest Date: 02/19/2019
Final Order: 04/22/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 04/22/2019 | $3,900.00 | 03/01/2019 | Serious | |
Penalty | C: Contested | 02/28/2019 | $6,630.00 | 03/01/2019 | Serious | |
Penalty | Z: Issued | 01/25/2019 | $6,630.00 | 03/01/2019 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.217(b)(12): All pressure vessels used in conjunction with power presses did not conform to the American Society of Mechanical Engineers Code for Pressure Vessels, 1968 Edition: 125 Gloucester Ave, Gloucester, MA; Press shop, building 1 a) On or about July 28, 2018, employees were exposed to explosion hazards from an air receiver tank, a pressure vessel, used on Bliss mechanical power press shop ID 14108. The vessel was not provided with a pressure relief valve. Abatement documentation is required for this item in accordance with the requirements of 29 CFR 1903.19(d).