Violation Detail
Standard Cited: 19100107 B05 I Spray finishing using flammable and combustible materials.
Inspection Nr: 1331625.015
Citation: 01002
Citation Type: Serious
Abatement Date: 07/08/2019 2
Initial Penalty: $6,467.00
Current Penalty: $3,880.20
Issuance Date: 12/27/2018
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 5
Report ID: 0418100
Contest Date:
Final Order: 04/04/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | P: Petition to Mod Abatement | $3,880.20 | 07/08/2019 | Serious | ||
Penalty | P: Petition to Mod Abatement | $3,880.20 | 07/01/2019 | Serious | ||
Penalty | I: Informal Settlement | 04/04/2019 | $3,880.20 | 05/15/2019 | Serious | |
Penalty | Z: Issued | 12/27/2018 | $6,467.00 | 01/24/2019 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.107(b)(5)(i): The average air speed over the open face of the paint spray booth was less than 100 linear feet per minute. Shop - On or about 07/16/18 and at times prior thereto employees spray-painted fabricated parts with flammable solvent-based coatings inside a spray booth. The linear air velocity (measured on several vertical planes at different heights) did not exceed 10 ft./min. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).