Violation Detail
Standard Cited: 19260251 A06 Rigging equipment for material handling.
Inspection Nr: 1328639.015
Citation: 03002
Citation Type: Other
Abatement Date: 3
Initial Penalty: $415.00
Current Penalty: $207.50
Issuance Date: 08/10/2018
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): A
Gravity:
Report ID: 0419700
Contest Date:
Final Order: 08/28/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/28/2018 | $207.50 | Other | ||
Penalty | Z: Issued | 08/10/2018 | $415.00 | Other |
Text For Citation: 03 Item/Group: 002 Hazard:
29 CFR 1926.251(a)(6): Each day before being used, and during use, where service conditions warrant, the sling and all fastenings and attachments were not inspected for damage or defects by a competent person, and damaged or defective slings were not immediately removed from service: a. On or about July 10, 2018 the wire rope sling being used to lift and set a 24 inch concrete pipe was not inspected before use, and although defective (the hook had a broken self closing latch), was not removed from service.