Violation Detail
Standard Cited: 19100132 D01 General requirements.
Inspection Nr: 1327532.015
Citation: 01001C
Citation Type: Serious
Abatement Date: 01/15/2019 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 11/02/2018
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): A
Gravity: 10
Report ID: 1032500
Contest Date:
Final Order: 11/28/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/28/2018 | $0.00 | 01/15/2019 | Serious | |
Penalty | Z: Issued | 11/02/2018 | $0.00 | 01/15/2019 | Serious |
Text For Citation: 01 Item/Group: 001C Hazard:
29 CFR 1910.132(d)(1): The employer did not assess the workplace to determine if hazards are present, or are likely to be present, which necessitate the use of personal protective equipment (PPE): a) Building 1, Wood Roofs, 8B Area: On or about June 13, 2018 and at times prior thereto; employees installed PVC sprinkler pipe from a height of 7.25 feet to 10 feet without fall protection, although the work area had not been evaluated for fall hazards by the controlling employer. Note* Abatement certification AND documentation ARE required for this item.