Violation Detail
Standard Cited: 19100252 C01 II General requirements.
Inspection Nr: 1322810.015
Citation: 01004
Citation Type: Serious
Abatement Date: 01/23/2019 2
Initial Penalty: $11,086.00
Current Penalty: $6,651.60
Issuance Date: 10/22/2018
Nr Instances: 1
Nr Exposed: 5
Related Event Code (REC):
Gravity: 5
Report ID: 0418100
Contest Date:
Final Order: 11/30/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | P: Petition to Mod Abatement | $6,651.60 | 01/23/2019 | Serious | ||
Penalty | I: Informal Settlement | 11/30/2018 | $6,651.60 | 01/23/2019 | Serious | |
Penalty | Z: Issued | 10/22/2018 | $11,086.00 | 11/01/2018 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.252(c)(1)(ii): When welding had to be performed in a space entirely screened on all sides, the screens were not so arranged that no serious restriction of ventilation exited: New England Wire Products Inc. in Greensboro, GA: Welding space was not entirely screened in on all sides. Employees adjacent to the welding area and in the welding area are exposed to arc flash from the welding on or about June 13, 2018.