Violation Detail
Standard Cited: 19261425 C03
Inspection Nr: 1321066.015
Citation: 03001A
Citation Type: Other
Abatement Date: 09/25/2018 2
Initial Penalty: $5,174.00
Current Penalty: $0.00
Issuance Date: 08/08/2018
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): A
Gravity:
Report ID: 0419700
Contest Date:
Final Order: 08/23/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/23/2018 | $0.00 | 09/25/2018 | Other | |
Penalty | Z: Issued | 08/08/2018 | $5,174.00 | 09/25/2018 | Serious |
Text For Citation: 03 Item/Group: 001A Hazard:
29 CFR 1926.1425(c)(3): 29 CFR 1926.1425(c)(3): The materials were not rigged by a qualified rigger. a. On or about June 5, 2018 the employer did not assure a qualified rigger, chose the appropriate rigging materials, determined the proper weights of the load and provided accurate information to the crane operator to assure a safe successful lift.