Violation Detail
Standard Cited: 19100269 C01 I Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1313494.015
Citation: 01001B
Citation Type: Serious
Abatement Date: 09/20/2018 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 08/24/2018
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): A
Gravity: 10
Report ID: 0627510
Contest Date: 09/19/2018
Final Order: 05/04/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | R: Review Commission | 05/04/2020 | $0.00 | 09/20/2018 | Serious | |
Penalty | C: Contested | 09/20/2018 | $0.00 | 09/20/2018 | Serious | |
Penalty | Z: Issued | 08/24/2018 | $0.00 | 09/20/2018 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.269(c)(1)(i): A more extensive job briefing was not conducted where an employee could not be expected to recognize and avoid the hazards involved in the job: On or about May 2, 2018, the employer did not conduct an extensive job briefing to employees performing repair work on an overhead power line. This exposed the employees to electrical hazards.