Violation Detail
Standard Cited: 19260062 E02 I Lead
Inspection Nr: 1312070.015
Citation: 01005
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $7,760.00
Current Penalty: $5,820.00
Issuance Date: 08/22/2018
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): R
Gravity: 5
Report ID: 0112000
Contest Date: 09/17/2018
Final Order: 04/25/2019
Emphasis:
Substance: 1591
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 04/25/2019 | $5,820.00 | Serious | ||
Penalty | C: Contested | 09/19/2018 | $7,760.00 | Serious | ||
Penalty | Z: Issued | 08/22/2018 | $7,760.00 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1926.62(e)(2)(i): The employer did not establish and implement a written compliance program to achieve compliance with 29 CFR 1926.62(c) prior to commencement of the job: PONEMAH MILL, 611 NORWICH AVENUE, TAFTVILLE, CT: On or about and at times prior to April 27, 2018, the employer had not developed a written Lead Compliance Plan. The employer was the General Contractor for the site and had general supervisory authority over the worksite which was an old mill (circa 1860s). Paint that was peeling from the walls was analyzed at the Salt Lake Technical Center and was determined to be positive for lead.