Violation Detail
Standard Cited: 19101200 E02 I Hazard Communication.
This violation item has been deleted.
Inspection Nr: 1312070.015
Citation: 01002A
Citation Type: Serious
Abatement Date: 10/10/2018
Initial Penalty: $5,174.00
Current Penalty: $0.00
Issuance Date: 08/22/2018
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): R
Gravity: 5
Report ID: 0112000
Contest Date: 09/17/2018
Final Order: 04/25/2019
Emphasis:
Substance: C326
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 04/25/2019 | $0.00 | 10/10/2018 | Serious | |
Penalty | C: Contested | 09/19/2018 | $5,174.00 | 10/10/2018 | Serious | |
Penalty | Z: Issued | 08/22/2018 | $5,174.00 | 10/10/2018 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.1200(e)(2)(i): At a multi-employer workplace, the EMPLOYER'S hazard communication program did not include methods the employer used to provide other employers with on-site access to a material safety data sheet for each hazardous chemical the other employer(s)' employees may be exposed to while working: (Construction Reference: 1926.59) SITE-WIDE: On or about and at times prior to April 27, 2018, multiple subcontractors; including painters, carpenters, plumbers, electricians, and window installers; were working on the site. The employer, the General Contractor for the project, did not provide other employers with information about hazardous chemicals to which their employees may be exposed while working on site. Such chemicals include, but are not limited to, isocyanate-based spray in foam insulation containing diisocyanates. The employer was the General Contractor for the site and had general supervisory authority over the worksite which was an old mill (circa 1860s). Paint that was peeling from the walls was analyzed at the Salt Lake Technical Center and was determined to be positive for lead.