Violation Detail
Standard Cited: 19260452 C02 Additional requirements applicable to specific types of scaffolds.
Inspection Nr: 1294095.015
Citation: 02002
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $9,054.00
Current Penalty: $9,054.00
Issuance Date: 05/01/2018
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity: 10
Report ID: 0420600
Contest Date:
Final Order: 05/29/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 05/01/2018 | $9,054.00 | Serious |
Text For Citation: 02 Item/Group: 002 Hazard:
29 CFR 1926.452(c)(2): Tubular welded frames and panels were not braced by cross, horizontal, or diagonal braces, or combination thereof, which would have secured vertical members together laterally: a) At the jobsite, employees in the process of removing stucco were exposed to fall, collapse and struck by hazards, in that, the tubular welded frame scaffolding system (5' deep, 7' wide by 5' high) 5 levels high by 7 columns across was missing cross bracing on the interior side 3rd column on the 1st, 2nd and 3rd levels. Observed on or about 2/12/2018.