Violation Detail
Standard Cited: 19260850 H Preparatory operations.
Inspection Nr: 1293737.015
Citation: 01009
Citation Type: Serious
Abatement Date: 03/06/2018 2
Initial Penalty: $5,174.00
Current Penalty: $2,587.00
Issuance Date: 02/26/2018
Nr Instances: 4
Nr Exposed: 4
Related Event Code (REC):
Gravity: 10
Report ID: 0111400
Contest Date: 03/22/2018
Final Order: 07/06/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 07/06/2018 | $2,587.00 | 03/06/2018 | Serious | |
Penalty | C: Contested | 04/02/2018 | $5,174.00 | 03/06/2018 | Serious | |
Penalty | Z: Issued | 02/26/2018 | $5,174.00 | 03/06/2018 | Serious |
Text For Citation: 01 Item/Group: 009 Hazard:
29 CFR 1926.850(h): When debris was dropped through holes in the floor without the use of chutes, without proper barricading, where signs warning of the hazard of falling materials were not posted at each level Location: 4 Winthrop Street, East Boston, MA On or about February 6, 2017, employees were exposed to struck by hazards, from falling debris and construction equipment, where proper barricading and hazard signs had not been installed.