Violation Detail
Standard Cited: 19150089 C01
Inspection Nr: 1288984.015
Citation: 01013
Citation Type: Serious
Abatement Date: 07/27/2018 2
Initial Penalty: $11,641.00
Current Penalty: $11,641.00
Issuance Date: 07/02/2018
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): A
Gravity: 10
Report ID: 0419700
Contest Date: 07/24/2018
Final Order: 05/17/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 05/17/2019 | $11,641.00 | 07/27/2018 | Serious | |
Penalty | C: Contested | 07/30/2018 | $11,641.00 | 07/27/2018 | Serious | |
Penalty | Z: Issued | 07/02/2018 | $11,641.00 | 07/27/2018 | Serious |
Text For Citation: 01 Item/Group: 013 Hazard:
29 CFR 1915.89(c)(1): The employer did not ensure the use of a lock to prevent energization or startup, or the release of hazardous energy, before any servicing was started. a. On or about January 21, 2018, along the pier, an employee was disconnecting a manifold from the riser and had not relieved the air pressure, exposing the employee to struck-by and drowning hazards.