Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1279160.015
Citation: 01003B
Citation Type: Serious
Abatement Date: 08/31/2018 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/03/2018
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): A
Gravity: 5
Report ID: 0830500
Contest Date:
Final Order: 05/31/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/31/2018 | $0.00 | 08/31/2018 | Serious | |
Penalty | Z: Issued | 05/03/2018 | $0.00 | 06/07/2018 | Serious |
Text For Citation: 01 Item/Group: 003B Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: (a) DCP Services LLC, at Highway 392 and Weld County Road 71, N 0.9, W 0.2, Briggsdale, CO: On and preceding 11/16/17, the employer did not ensure that procedures were developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section. Employees of DCP Services LLC and Complete Energy Services Inc were involved in the removal of a hydrate blockage within a DCP Services LLC pipeline. The DCP Services LLC pipeline transported approximately 350 psi natural gas and other products of crude oil and gas extraction. The high pressure natural gas was both a pneumatic energy source and a thermal energy source. The employer had not developed, documented, and utilized a procedure for the control of the hazardous energies. This condition exposed an employee of DCP Services LLC and employees of Complete Energy Services Inc to uncontrolled energy hazards.